Feb 7, 2011

You were a shitty banker anyway.

I was re-reading Adaptive Curmudgeon's post titled "Are We Not Men?" the other day, and this one rings so very true to me:

A man who is temporarily unemployed should be fixing the roof and stacking firewood. If the condition of unemployment stays too long you’re overvaluing yourself. Step back and realize your true value; somewhere there is a ditch that needs digging and you were a shitty banker anyway.


There are far too many people over-valuing themselves in society. I've been through a dozen stores in the past week with "help wanted" signs of one form or another. Yes, most of them are minimum-wage jobs... but they'll put some food on the table.

Feb 6, 2011

Snow

Went to MrsZ's hockey game last night after work. When I left work it was spitting a slushy bit of crap, downtown was raining, and home had a bit of crunchy in the rain. Back downtown for the game and it was raining.

We left the game, and it looked like someone had exploded a huge feather pillow overhead. HUGE snowflakes falling heavily - almost three inches worth in the 90 minutes we'd been inside. We started for home, then when traffic stopped because people were sliding around, we turned around and had dinner at a greasy spoon before taking the back roads home. Slow going but no traffic and no problems.

Feb 4, 2011

Reality sets in

Reality is a harsh mistress. We've done this bathroom upgrade as inexpensively as reasonably possible, but the numbers at the end of the month just aren't adding up. On top of that, overtime at work has essentially dried up, as we're at full staffing for the first time since I've worked there.

Accordingly, I'll be moving several guns in order to make things come out a bit closer to right. I do not have pictures of all these handy, although most have gone across the pages here occasionally. All prices are including shipping FFL-FFL for pistols, individual-FFL for long guns; face-to-face deals in NY are possible within reason. Reasonable offers will be considered. No trades, sadly. Please send ALL offers by private email - zercool gmail com.

Smith & Wesson 28-2 Highway Patrolman 4" .357Mag. Refinished to bright nickel sometime in its life, has a fantastic trigger. Magna stocks, not numbered (I added them at some point) but I believe period-correct. N-series, four-digit serial. One flake in the nickel on the cylinder approximately 1/4" in diameter, near the front of a flute. Flame cutting is minimal, lockup is solid. $475. ** Sold pending payment **

282L
282R

Interarms Virginia Dragoon 7.5" .44Mag. Single-action revolver, stainless with wood grips. Arguably as sturdy as a Ruger; it's a hell of a shooter and has a wonderful single-action trigger. S-series, three-digit serial. Butt engraved "Sic Semper Tyrannis" (Thus always to tyrants). Includes original box which has some wear but is in good shape. $425.

DragoonL
DragoonR

Thompson-Center Contender pistol, .30-30 Super 14 barrel with 2x Tasco scope. Blue frame and barrel, Pachmyr grips. Sling studs. Hell of a shooter; I never did get to take a deer with it. $425.

Smith & Wesson 5946 9mm autoloader. Double-action only, stainless. Some duty wear, overall excellent shape. Three-dot sights. NYPD still issues these as duty guns. S&W has discontinued production of the third-gen autos in favor of low-cost plastics. With five pre-ban magazines. $475.

5946L
5946R

Remington 572 Fieldmaster .22LR pump rifle. With Weaver rimfire scope. Standard field wear, no rust. 1950s vintage, it's C&R eligible. I've never had it to the range. Beautiful rifle. $250. ** Sold pending payment **


Remington 710 .270 bolt rifle. With Bushnell 3-9x40 scope, two or three mags. Shoots 1.5MOA with 130gr CoreLokt. Solid deer rifle. Synthetic stock, parkerized barrel, bit of freckling on the bolt handle. $325.

Savage 93 .17HMR bolt rifle w/ Accutrigger. GV model - hardwood stock, heavy blued barrel. With Bushnell Banner 3-9x40 scope, three mags. Unbelievably accurate. $375.
**Additionally, have approximately 1,400 rounds of .17HMR ammo. Mostly Hornady 17gr Vmax, some others. $275 w/ the rifle, $300 without and only if the rifle goes first.**

9317L9317R

AR-style rifle. Anvil Arms lower w/ Gadsden Flag engraving on mag well, DPMS parts kit. A2 stock, Falcon ERGO overmold grip. DPMS DCM A2 upper. 20" 1/8 stainless heavy barrel, free-floated, no muzzle device or bayo lug (ban compliant). Match sights, front post replaced with a KNS hooded reticle. DCM-approved fore-end weight included (3lb lead weight that fits in the handguard). $1000.

ARL
ARR

And one book: "Sixguns" by Elmer Keith. This is perhaps THE definitive book on revolvers and has some wonderful stories in in. Hardbound, with dustcover, as-new condition. $100 shipped. ** Sold pending payment to OldNFO **

One more thing: One pair of Danner Pronghorn 800 hunting boots. Mens 12 wide (EE). Worn twice in the snow, as-new, no box. A size too small for me. $150 shipped in the US.

This is a post of last resort. Pictures can be taken of any of these upon request.

Damn, this sucks.

Photodump, major repairs done!

Mostly of the bathroom.

In the initial post, I had a few pictures up of the "before", along with the early stages of demolition.

Over the intervening weekend we took a side trip into the kitchen to fix a leaking draing, and in the process found out the vent on that drain line had been rather kludged:

IMG_0161

That's a shining example of "what not to do" or "redneck engineering". It makes the drains slow, and when pressures change just right, it vents sewer gas back out. In our case, it was venting it into a wall space which made our bedroom occasionally smell bad. We put the proper vent in (called a "cheater vent", and meets code if there is a real vent elsewhere) and it has (A) stopped the stench and (B) the kitchen sink drains MUCH faster.

While Dad and I were fixing that drain, MrsZ was getting the bathroom sanded and primed.

So here goes the dump, with commentary along the way.

After the first post, this is where things were:
IMG_0155

The vanity and washer/dryer were out, the toilet had been removed from its base, and the tile and underlayment were all stripped up. No pictures of the sanding/priming, as I was either at work, or occupied with the drain repair.

Monday this week, we started (and finished) painting:
IMG_0166

IMG_0167

IMG_0168

Tuesday, I sanded the subfloor, wiped it with bleach solution, and let it dry. Then I started cutting and putting down underlayment. This was an all-day project as I measured, remeasured, and cut around the stubs for plumbing. I did the best I could, but it wasn't perfect. Fortunately, the ugliest ones will be well-hidden by the vanity.

IMG_0178

IMG_0179

(Handy tip: an 8oz margarine tub seals a toilet stub just perfectly!)
IMG_0181

IMG_0182

IMG_0183

That was Tuesday. I was rapidly running out of energy and patience with this project...
IMG_0184

Wednesday morning I slept in a little bit, then got ready for tiling. Vinyl tile (and sheet) has a tendency to show ANY imperfections in the underlayment: gaps larger than 1/16", any bumps, etc. So I spackled the one large gap (my straight cut wasn't quite), swept several times, vacuumed carefully, swept again, vacuumed again, and waited for the spackle to dry.

I chose to use tile adhesive in addition to the self-adhesive tiles*, so that required a fair bit more effort. First I found and marked the center of the room, then determined what pattern I wanted to lay. MrsZ had strongly pushed for a diamond pattern, but looking at it I didn't care for it. I tried jack-on-jack and that looked far too institutional, so I tried running bond. Perfect!

I spread adhesive over the back half of the room and let it set for its needed "open time" (time to let the glue tack up and evaporate some of the solvents), then started laying tile at the center of the floor. I laid all the field tiles first, then the edge pieces that needed trimming, then spread the front half of the room and started cutting the tiles for the stubs in the back half.

It's labor-intensive work, but not overly complicated. Vinyl tiles score easily with a utility knife, and using the spacers makes the gaps consistent. Those spacers work a trick, but they hurt about as much as Legos to step on with bare feet.

IMG_0189

IMG_0191

IMG_0192

We had briefly debated whether we wanted to gap-and-grout the tiles, or lay them on tight seams. It meant more effort, but I'm very glad we went with the grout. Once a tile was down flat, it wasn't coming back up, nor was it shifting side-to-side more than a tiny bit. Even being careful with the spacers, there are a few spots where my 1/8" spacing widened out a tiny bit, and the grout hides that admirably.

Wednesday evening the adhesive cured, and Thursday morning I got what I needed to do grout. Just before I dug in, the delivery driver called to tell me he was half an hour away with the washer, so I sat back and read a book instead. The washer was delivered (to the middle of the dining room), and I started with the grout:

IMG_0195

One quart of pre-mixed grout, one bucket of clean water, one large sponge, one roll paper towels, one grout float, one grout tube, a trash bag, and some paper to catch the mess. The tube is optional - it's essentially an overgrown cake decorator's tube - but it makes laying grout right in the seams MUCH easier.

Work on 4-6 square feet at a time, which will be about 10-12 linear feet. Use a damp paper towel and wipe down the seams and a couple inches on each side. Squeeze grout into about 2/3 of the space you're working on, then use the float at a 45-degree angle (from the floor) to push the grout in and along.

As you finish a section, use the sponge - just barely damp - to lightly buff the area you're working. You're trying to smooth the joints and loosen up the excess. Use paper towels to wipe off the tiles. Whenever the bucket of water is cloudy, change it for clean water. Expect to do this after *every* patch of tile. Just keep chugging along - it goes fairly quickly.

IMG_0196

IMG_0197

IMG_0198

With that done ... put a fan in the door and walk away. Don't walk on it for several hours while the grout dries and sets. When it is dry to the touch (four hours in my case), use a soft rag (like a car polishing rag, old diaper, old flannel shirt, whatever) to gently buff the whole floor. There's going to be a light grit on the whole thing until you do this. DO NOT MOP IT. Just lightly buff it by hand.

The next day or two days later, seal your grout - this will keep it from growing mildew or discoloring over time.

When I was done with all that last night, I looked at our pile of laundry and decided it would be OK to put the appliances back in... So I did.

IMG_0200

New washer, old dryer. I'll be working on baseboard trim, wall plates, and getting the vanity and toilet back in over the coming week. We have clean clothes in the meantime. :-)

* - Whoever did the upstairs bathroom used self-adhesive tiles without glue or grout, and they shifted over time. This is the end result:
IMG_0202

See why glue and grout makes sense?

Feb 1, 2011

Bathroom Update

Forgive the lack of posting. The last work week saw me working my normal 7a-3p, then coming home and working on demolishing the bathroom. Sometime around Thursday, MrsZ found a suspicious wet spot on the cellar ceiling. Saturday and Sunday evenings were spent tearing apart our kitchen cabinets and repairing the drain line. On the plus side of that, we found that someone had kludged the vent for the drain - by putting in an upright with a 90 in a wall space, and stuffing the open end with a bit of pink fiberglass insulation and a bottlecap to hold it in place. That has since been corrected to code, and I expect that we will no longer have funny smells in the bedroom that were blamed on the cats.

Unfortunately, that set back my schedule for working on the bathroom by two evenings. MrsZ managed to get the sanding and priming done, and we did the painting yesterday. (Valspar calls it "Snowy Dusk", I call it "very light gray".) I rolled, she did the finicky details.

This morning I pulled out everything that was in the room and sanded the subfloor, then vacuumed, then wiped the whole floor with a mild bleach solution, then damp-wiped the walls (no bleach). Put a heater and fan in to dry things out, and had lunch.

Lunch complete, I started measuring very very carefully, and then cutting up the underlayment panels. The room was just the wrong size to do the whole thing with two sheets (9x7, underlayment comes in 4x8 sheets) without some inconvenient seams. So, three sheets cut apart, and NINE stubs drilled or cut (washer hot/cold, washer drain, dryer gas, toilet cold, toilet drain, sink hot/cold, sink drain), with only minor corrections necessary. I won't win any prizes for pretty, but they're in. Stapled down according to spec (2" interval on edges, 4" across the body) means there are approximately eleventy-billion staples now in our bathroom floor, and if they ever need to come out I pity the foo'.

Tomorrow I'll be laying tile. Home Depot may be delivering the washer in the afternoon (depending on weather), but it can't be hooked up for at least three days - two for the tile to cure, one day to grout and let that cure. And, of course, we have to find baseboard trim and get that cut and installed as well.

I've taken pictures as the process progresses - look for one large photo post in a week or so.