Jun 13, 2011

Cabela's again

It's like a drug - I can't stay away from a Cabela's. Being able to peruse the used-gun racks at will is wonderful. The one in E. Grand Forks, MN had a nice Marlin stainless guide gun on the rack for $550 - moderately tempting. Also a beat-to-death 200,000-series Ithaca 37 for $240 - a bit overpriced for condition, IMHO.

I ended up leaving with a couple jars of seasoning rubs (Maple Jalapeno and Mountain Man Bourbon), a new hat to supplement the very faded and sweat-stained one that lives in my truck, and a BLACKHAWK! Serpa CQC for the M&P9.

Nothing terribly exciting, but my wallet wasn't going to support excitement on this trip.

Jun 12, 2011

Modern technology, William.

72mph, a magic box on the dash telling my father-in-law where to go, while I relax in the back seat and read blogs, chat on IRC, and listen to on-demand music on another magic box. It's the damn future, man.

Jun 9, 2011

Hoofed rats

Long-ass road trip interrupted by a hoofed rat with suicidal inclinations at 0430. Color me unimpressed.

Jun 3, 2011

Barn, fascia, soffits

When I last posted (with pictures), I'd just finished about half the sheathing. Since then, the vast majority of the remaining sheathing went up, as well as the roof deck and part of the fascia.

Yesterday's weather forecast was beautiful and we had sufficient coverage at Day Job for me to take a day off without forcing overtime, so I did. I started a little later than planned - around 9 - but got in a bit over seven hours of solid work before I had to clean up for work at BBHIS.

Since I'd hung the barge rafters a few days prior, I needed to cut and install the lookouts.

Here's the barge rafters (2x4s). They aren't purely cosmetic, as they add rigidity to the edge of the roof deck and hold up the fascia, but they aren't designed to be load-bearing members.

IMG_0372

Lookouts are chunks of 2x4, cut to length, spaced 24" on center, and nailed in from both ends. Just a bit of extra rigidity. In this picture you can see the fascia has been installed over the barge rafter as well.

IMG_0375

After the barge rafters were installed (and before the fascia went on), I installed my soffit vent. There are LOTS of options for this - perforated vinyl, small circular vents, and so forth - but given that this will be occupied by livestock, more ventilation is more better. A roll of 8" wide screen was stapled to the bottoms of the rafters and the back of the fascia. Soffit boards will be installed starting at the back edge of the screen, providing something like six square feet of free vent space on each side of the building.

IMG_0373

I got a little ahead of myself here - I installed this piece of drip edge early. As such, it was a hair short on both ends because I didn't account for the fascia on the gables. The other three sides were installed properly, though.

IMG_0374

Since I was on a roll, I started the dividing wall for the chickens. It went together quickly and relatively pain-free, although installing it meant using my Big Hammer to convince it. The door was cut in without trouble and hinges and a latch were installed. The sloping wall remains to be done but shouldn't be a big deal.

IMG_0376

As I started to run out of time, I decided to get the window openings cut in the short wall. These are 1'x3' sheets of Lexan, which will just be set in the wall openings with a simple frame. Light only, no ventilation. The blank wall on the left in this picture will have two 18x24 plexiglass windows cut in as well; no shortage of light here!

IMG_0377

I'm hoping to get the roof done tonight after work - since the drip edge is on, all I need to do is staple down roof felt, cut a vent at the ridge, and zip on the shingles. It's a two-square up'n'over job and I should be able to knock it out real quick. I'll be calling the rental place shortly to see if they have a nailer available for today...

Jun 1, 2011

Melty

Ice cream machine is on the fritz; I've been working beaucoup hours and spending as much time as possible working on the barn. Roof deck is done, most of the wall sheathing is up, front and rear fascia are on. End fascia and lookouts need to be put up, then drip edge, soffits, roof felt, shingles, paint again, windows, door, trim.

Given the heat yesterday (90F, with humidity in the same vicinity) I didn't get a lot done. I tried. Even after the sun went down (we live in the shadow of a hill - we're in shade about 90-120 minutes prior to actual sunset) it was still too hot to work. I made the plumb cuts on the fascia and cut a 2x4 into small pieces for lookouts, then decided I was both tired enough and sweaty enough to be a danger to my own fingers.

Tomorrow's forecast is much better - upper 60s and sunny - and I've taken the day off from Day Job in order to see how much I can get done. Here's hoping.